COMPLETED PROJECTS
TEKNOPARK ISTANBUL R&D BUILDING
Project completed.
Teknopark Istanbul R&D Building
Project Details
SMC OFFICE AND FACTORY BUILDING
Project completed.
The construction project of SMC Office and Factory of SMC Turkey Otomasyon
Project Details
ASPİLSAN Litium Ion Battery Manufacturing
Project completed.
Our company Dost İnşaat has undertaken the construction works of the project "The Simulation Building
Project Details
Dunker Building
Project completed.
The construction of the project of the Building for Escape & Rescue from a Helicopter Crashing
Project Details
Tekirdag City Hospital
Project completed.
Tekirdağ City Hospital, one of the general hospitals which are realized by public-private sector cooperation model of the Ministry of Health...
Project Details
Hospital in Bozüyük County, Bilecik
City
Project completed.
200-bed State Hospital in Bozüyük County, Bilecik City The State Hospital to be built in Bilecik Bozüyük and awarded by the General
Project Details
TAI Engineering Building
Project completed.
Our company has assumed the lump sum Turnkey Project of the Engineering Building of TAI (Turkish Aircraft Industries Corporation)
Project Details
ISPARTA CITY HOSPITAL
Project completed.
The Isparta City Hospital, one of the general hospitals which are realized by public-private sector cooperation model of the Ministry of Heath...
Project Details
ESKISEHIR CITY HOSPITAL
Project completed.
Eskişehir City Hospital, one of the general hospitals which are realized by public-private sector cooperation model of the Ministry of Health...
Project Details
BULVAR LOFT
Project completed.
Bulvar Loft is a multifunctional living complex including luxury residences and social areas, restaurants and stores. The project having a total...
Project Details
Incek Loft
Project completed.
It is a multifunctional living complex including luxury residences and social areas, restaurants and stores. Incek Loft project having a total ...
Project Details
BOSPHORUS CITY
Project completed.
Within the scope of this Project, our company has completed the Project by constructing 928 independent residences, land arrangements...
Project Details
ISTANBUL PALACES
Project completed.
On a total area of 61.000 m², 307 fully independent residences, parking lots and garages, swimming pools, ornamental pools...
Project Details
INCEK LIFE
Project completed.
In the Project consisting of multi-storey villas and parking lots; there is an outdoor parking lot and sports areas, social facilities, biological...
Project Details
OTTOMARE SUITES
Project completed.
It is a mixed product including luxury residences and a hotel. The project has an area of 13.450 m2 with its 25 floors+ground floor and 2 basements...
Project Details
SOYAK SIESTA
Project completed.
In the Project including 663 flats and 5 residential buildings, all the infrastructure, landscaping, electrical and mechanical Works...
Project Details
BAHÇEŞEHİR MODERN
Project completed.
In the Project, there are 727 residences, parking lot, walkways, pools and a landscaping area in a total 82.856 m2 area...
Project Details
NEF 11
Project completed.
Within the scope of our project, there are 352 residences, 112 offices, 14 stores, technical infrastructure, landscaping, pools and community...
Project Details
MERCEDES BENZ
Project completed.
The construction Works of the management complex of Mercedes-Benz Türk A.Ş. that is located in Istanbul – Hadımköy has a total area of 40.000 m2...
Project Details
ISIK UNIVERSITY
Project completed.
Within the FMV Işık University Campus in Istanbul – Şile; the construction of D-K building has started in 2006 and at the beginning of 2007
Project Details
Gidasa
Project completed.
Gıdasa Hendek Beverage Plant that is a turn-key Project within the scope of the Project that combines the food and beverage plants of Gıdasa...
Project Details
FİLİZ BARILLA
Project completed.
Filiz Barilla Pasta Factory is located in the city of Bolu. The factory is owned by Filiz Gıda ve Sanayi A.Ş. first of all, 5500 m2 ...
Project Details
Betek
Project completed.
This work includes the turn-key construction of the production, storage and management areas on a total 40.000 m2...
Project Details
Temsa
Project completed.
Factory building of Temsa Automotive Group at Adana Production Plants with an approximate indoor area of 10.800 ....
Project Details
EKOL & LOREAL
Project completed.
Hadımköy Warehouse plants of Ekol Logistics has an approximate construction area of 40.000 m2 and as the first time...
Project Details
Awamedica
Project completed.
Awamedica Pharmaceutical Plant, for which the construction has started in 2006 in Iraq – Erbil, has a total indoor ...
Project Details